How Problems On The US Navy's First New Supercarrier Helped In Building The Next One Cheaper And Faster

The aircraft carrier John F. Kennedy as its dry dock area is flooded three months ahead of its slated production schedule, October 29, 2019. US Navy/MCS3 Class Adam Ferrero

Business Insider: How the problems on the US Navy's new supercarrier helped them build the next one cheaper and faster

While the first-in-class aircraft carrier USS Gerald R. Ford faces lingering problems, the second Ford-class carrier, John F. Kennedy, just hit a milestone ahead of schedule.

The Kennedy's progress is due in part to its status as second in the class, allowing its builders and crew to glean know-how picked up by the Ford's designers and sailors.

Days after the first-in-class aircraft carrier USS Gerald R. Ford sailed out of a "challenging" post-shakedown work period that was extended three months because of maintenance problems, the dry dock holding the second Ford-class carrier, the John F. Kennedy, was flooded, launching the carrier three months early.

Read more ....

WNU Editor: Too early to say that the problems plaguing the USS Gerald Ford will not repeat itself aboard the USS John F. Kennedy. 

0 Response to "How Problems On The US Navy's First New Supercarrier Helped In Building The Next One Cheaper And Faster"

Post a Comment